Maintain consistent operation with model-specific inspections, clean hydraulic oil, effective cooling and documented servicing. Learn what operators can check and when qualified service personnel are needed.

Contact DILOYA +
Aluminium chip briquetting installation with discharge chutes and bins of finished briquettes

To maintain an aluminium chips briquetting machine, follow the model-specific service schedule, keep the feed and working area clean, monitor hydraulic oil and cooling, inspect wear parts and record changes in performance. Any task that exposes personnel to moving parts, pressure or electrical hazards requires the machine-specific energy-isolation procedure and authorised personnel. This guide is a planning aid, not a replacement for the operating manual.

1. Start with the Correct Machine Manual and Maintenance Record

Maintenance requirements depend on the press configuration, operating hours, chip condition, ambient temperature and installed accessories. Keep the machine model, serial number, hydraulic and electrical diagrams, lubricant specifications and spare-parts list available. A Vertical Briquetting Press and a Horizontal Briquetting Press may have different access arrangements and service points.

Record operating hours, oil temperature readings, alarms, unusual noise, leaks, servicing and replaced parts. Compare readings under similar production conditions. A gradual increase in cycle time or oil temperature is easier to investigate when the previous operating condition is documented.

2. Isolate Hazardous Energy Before Servicing

Before entering a danger zone or removing guards, authorised personnel must follow the documented isolation procedure, control stored energy and verify that the equipment is safe. An emergency-stop button alone is not an energy-isolating device. Hydraulic pressure, accumulators where fitted, gravity and connected conveyors must be included in the assessment. General principles are described in OSHA's Control of Hazardous Energy overview; applicable local requirements and the machine procedure govern the actual work.

Do not reach into a hopper, forming chamber or discharge opening to remove a blockage while the machine can operate. Never loosen a hydraulic fitting to check for pressure or search for a leak with your hand. Suspected high-pressure fluid-injection injuries require immediate emergency medical attention, even when the wound appears small. Electrical work and pressure-system repairs belong to qualified specialists.

3. Complete Pre-Shift Checks from Safe Access Points

> Check that guards, doors, warning labels and access routes are intact.

> Look for oil leakage, damaged hoses, loose components or obstructed discharge areas without entering a danger zone.

> Check oil level and condition using the indicator and machine state specified in the manual.

> Confirm that the cooling unit has unobstructed ventilation and no visible damage.

> Check incoming chips for unsuitable foreign objects, mixed materials or changes in chip size and residual fluid.

> Review unresolved alarms and the previous shift's maintenance notes before starting production.

Check emergency stops and interlocks only through the approved test procedure, with no person exposed to danger. Stop and report failed safety functions; do not bypass them to keep production running.

4. Keep Chips, Fines and Foreign Objects under Control

Clean around the feeding and discharge areas using the site's approved method after the required isolation. Remove accumulated material before it obstructs access, sensors or ventilation. Long tangled chips, hard foreign objects and an inconsistent feed can interrupt production, so chip preparation is part of maintenance planning as well as equipment selection.

Fine aluminium dust can present a fire or explosion hazard under suitable conditions; it should not be treated as ordinary household dust. Use a site-specific dust-control plan and appropriately selected collection equipment, not a domestic vacuum or compressed air that disperses fines. See OSHA's Combustible Dust overview for background on this hazard.

For the wider material route, read How to Choose a Metal Chip Briquetting Line for a Small CNC Machine Shop. Feeding, chip preparation and fluid management affect how consistently the press can work.

5. Maintain Hydraulic Oil Cleanliness and Filtration

Use only the oil specification approved for the particular machine and operating environment. Do not select viscosity from a generic online recommendation or mix oils without confirmed compatibility. Keep filling equipment clean and the reservoir closed, and investigate falling oil level instead of repeatedly topping up an unresolved leak.

Inspect filter indicators as instructed and replace elements with the specified type. Oil analysis, where recommended, can help assess contamination and fluid condition. Oil appearance alone does not establish that it is serviceable. Milky fluid, persistent foaming, unusual odour or a temperature change should prompt investigation under the manufacturer's procedure.

Oil and filter replacement intervals must come from the manual and condition-based service plan. This article does not prescribe a universal number of hours: a lightly used installation and a continuously operated line may need different maintenance arrangements.

6. Keep the Cooling System Effective

Where an industrial oil chiller is installed, monitor its displayed temperature and alarms, keep its ventilation path clear and service the heat-exchange surfaces according to its own instructions. Isolate equipment before cleaning or accessing fans. Refrigeration repairs require the appropriate specialist; water-cooled systems need a service plan suited to their water circuit.

Do not raise alarm limits to hide overheating. Check cooling performance, ambient conditions, oil level and the operating duty, and have qualified personnel investigate persistent temperature problems. Cooling supports sustained operation, but does not remove the need for planned inspections and maintenance.

The Thai customer case Aluminium Chips Briquetting Machine describes a 6061 aluminium installation with industrial oil cooling. Its project data are not service settings or guaranteed ratings for other machines.

7. Inspect Tooling, Guides and the Feeding System

During planned shutdowns, authorised technicians should inspect the forming tooling, accessible guides, wear components, fasteners and feeding equipment as specified. Look for abnormal wear, scoring, damage or misalignment. Use the approved measurement limits, tightening values, lubricant and replacement procedure rather than estimating by appearance.

A change in briquette quality does not automatically mean that the die is worn. First record whether the chip alloy, size, residual-fluid content, feed rate or operating conditions changed. Do not compensate for a fault by increasing hydraulic pressure beyond the approved setting.

8. Build a Practical Maintenance Checklist

The following is a planning framework, not a substitute for the manufacturer's intervals. Assign tasks by operating hours, condition and site risk assessment. Inspection inside guarded areas requires the appropriate isolation.

Planning stageMain focusRecord or action
Before each shiftSafe visual checks, feed condition, indicators and unresolved alarmsLog abnormalities; do not start with an unresolved safety defect
Approved housekeeping shutdownChip accumulation, discharge access and ventilationUse the documented isolation and suitable cleaning method
Scheduled serviceLubrication, tooling, filters, hoses and cooling equipmentFollow model-specific intervals and record parts and findings
Condition-triggered investigationRising temperature, slower cycles, leaks or changing outputCompare operating records and involve qualified service personnel
Return to serviceGuards restored, work area cleared and approved functional checksAuthorised release and documented handover

9. Know When to Stop and Request Service

Stop the machine safely and follow site procedures if there is a failed guard or interlock, damaged hydraulic hose, significant leak, smoke, burning smell, severe abnormal noise or repeated protective shutdown. Keep others away from the hazard. Do not repeatedly reset alarms without identifying the cause.

When contacting DILOYA, provide the model and serial number, operating hours, alarm text, recent material changes and maintenance history. Photographs or videos should be taken only from safe positions. Explain whether the symptom occurs at startup, during compression or after prolonged running; this is more useful than describing the machine simply as “low output”.

FAQ

How often should hydraulic oil be changed?

Use the interval and condition criteria specified for the actual machine, oil and operating environment. Operating hours alone may not capture contamination or an abnormal fluid condition, while oil colour alone does not establish that it remains serviceable. Keep filling and service records and use oil analysis where the manufacturer recommends it. Do not invent a universal replacement period or transfer one from a different press; ask for the approved specification when it is missing.

Can a machine with an oil chiller run continuously?

An oil chiller can support the thermal duty of a suitably configured machine, but it does not establish the duty rating of the complete installation. Feeding, wear, inspections and planned service still affect available production time. Confirm the rated operating conditions and maintenance windows rather than interpreting “24-hour production” as permission to run without checks or shutdowns.

Aluminium Chips Briquetting Machine describes one Thai installation with oil cooling. Its reported results belong to that project's feed and configuration; Industrial Oil Chiller provides relevant equipment context, not a universal guarantee.

Why have the briquettes become loose or inconsistent?

Begin by identifying what changed: alloy or chip geometry, retained fluid, hopper supply, production settings or service condition. A gradual change under stable feed suggests a different investigation from an immediate change after a new material batch. Record the affected cycle stage and product condition for qualified assessment. Increasing pressure without finding the cause can conceal a feeding or wear problem and must not replace the authorised procedure.

What information is needed for a maintenance plan?

Provide the exact model and serial number, actual hours and duty cycle, feed condition, ambient environment, installed accessories and service history. Then allocate each task to an authorised role and a specified trigger: before use, at a service interval or when a recorded condition changes. For an installation such as Vertical Briquetting Press, obtain the documentation for the supplied configuration rather than copying the service settings of a visually similar machine.

Leave A Message

Let's Figure Out The Best Solutions!

Tell us what you need.

Share your material, target hour capacity and other requirements. Our engineering team will reply with a suitable solutions.

01Call DILOYA+86 152 2134 765002Email our teaminfo@diloya.com
We use your details to respond to this enquiry. Read our Privacy Policy.